wpcf42b7be.png
wp41d0d798.png
wpda1b29f5.png
wp4d575a10.png
wpcf8beca3.png

Customer QUOTE

+62 (21) 869-04 333

+62 (21) 869-04 332

Mail to:

wp5533b116.gif
wp5533b116.gif
wp5533b116.gif
wp5533b116.gif
wp08ef180b.png

MANAGING YOUR TIME MORE PRODUCTIVE

wp2dc64550.png
wp38a67ff7.png
C-SAT has wide-ranging skills and proven experience especially in development project in the area: power distribution, power protection, and         
power equipment maintenance. We achieve tailor made a single-source multi vendor for full-line manufacturer of leading electrical product brands as extensive as products, solutions and services meet global electrical standards such as IEC, CSA, and ANSI/NEMA
Application Expertise

PROTECTIVE RELAY COORDINATION
A comprehensive study of relay protective schemes can protect equipment and personnel as well as improve process uptime
STANDBY POWER SYSTEMS
Use diesel generators and gas turbines to supply emergency power for critical services and demand reduction
SCADA PACKAGES:
An effective SCADA package providing operating personnel with the tools necessary to monitor and control all aspects of the power system also include power monitoring, demand control, sequence of events, and load shed schemes
POWER MONITORING
Power parameters such as volts, amps, watts, and frequency can be monitored to reduce energy costs, improve yields, prevent equipment damage, and manage energy transactions
DEMAND CONTROL
Monitoring power usage and predicting demand can eliminate expensive demand surcharges. Avoid setting new demand peaks by shedding non-essential loads or starting up auxiliary generators
SEQUENCE OF EVENTS RECORDING
Events that cause power system trips and outages can be monitored and logged so that the exact cause and order of occurrence can be determined. Knowledge of what caused an outage can help prevent it from happening again.
LOAD SHED SCHEMES
Determining up front which loads can be shed in an emergency situation can help avoid outages and prevent new demand peaks from being set. The load-shed schemes are built into the SCADA logic and can happen automatically
wp7a10ee31.png